Assignment Name:
The Traffic Survey for The Study for Karachi Transport Improvement Project (KTIP) (Funded by JICA)
Country:

Pakistan

Location within Country:

Karachi

Name of Client:

Nippon Koei Co. Ltd. (Mr. Shogo Uchida Uchida-shen-koei.jp)

Completion Date:

February 2011

Name of Associated Consultants, if any:

None

Narrative Description of Project:

Primary Disciplines:
  • HIS & Transport Surveys
  • Demand forecast Modeling
  • Transportation Planning
  • Mass Transit, BRT/MRT Options Planning

Description of Actual Services Provided by Our Staff within the Assignment:

The services of Exponent Engineers have been hired for the following tasks:
  • Household Interview Survey (40,000 households)
  • Screen Line Survey (15 locations)
  • Cordon Line Survey (3 locations, I Airport, and 1 Station)
  • Mid-Block Traffic Count Survey (15 times at a location)
  • Cargo Movement Survey (3 locations)
  • Passenger Interview Survey (2,000 samples)
  • Public Transport Survey (15 locations)
  • Travel Speed Survey (10 major roads)

Scroll to Top