Assignment Name:
Peshawar Sustainable Bus Rapid Transit (BRT) Corridor Project – Package 3: Operational Design and Business Model (ODBM)
Country:

Pakistan

Location within Country:

Peshawar

Name of Client:

Asian Development Bank (ADB) / Transport and Mass-Transit Department, Government of Khyber Pakhtunkhwa.

Completion Date:

Dec 2021

Name of Associated Consultants, if any:

None

Narrative Description of Project:

Pre-Feasibility Study (PFS) in May 2014. This technical assistance developed a 20-year urban transport strategy with a 10-year action plan. Based on available data and generic estimates, it recommended development of Bus Rapid Transit (BRT) on corridor 2 (GT Road from Chamkani to Karkhano). The total length of the BRT corridor is 27 km. 27 BRT stations are constructed. The GoKP requested ADB to provide a Project Design Advance (PDA) to conduct detailed engineering design and assist in the procurement of civil works and equipment, ahead of ADB’s Project Loan expected in 2017. The total project is a full “façade-to-façade” reconfiguration of the entire 27-km BRT corridor [Phase 1], together with associated infrastructure. GoKP provided 15% of total project cost to cover mainly for taxes & duties, and for land acquisition and resettlement costs. This Project is awarded 1) Gold Standard BRT Award by ITDP (Institute of Transportation & Development Policy), 2) Sustainable Transport Award, and 3) Best Smart Ticketing Award

Description of Actual Services Provided by Our Staff within the Assignment:

1. BRT Operations Business Plan 2. Bus Industry Restructuring Program 3. BRT Fleet Procurement 4. ITS Equipment Procurement 5. Traffic Signals & Traffic Management Centre Procurement 6. BRT Electronic Fare Collection System Procurement 7. BRT Branding and Marketing Plan; Planning Studies 8. Architectural Design of Two (2) BRT Bus Depots at (Chamkani & Hyattabad) with Commercial Centers. 9. Design of Bus Stagging, Public Parking & Commercial Centre at Dabgari Gardens 10. Preparation for BRT Service Start Up 11. Commissioning of BRT Operations 12. Traffic Studies 13. Estimation, preparation of contract documents & bid evaluation. 14. Preparation of Bidding Documents and execution of the entire bidding process for the following: • Fleet Supplier • Bus Operator • System Control Service Provider including ITS 15. Preparation of Technical Feasibility Study 16. Preparation of Economic Feasibility Study