Skip to content
Home
Firm
Menu Toggle
About
MD’s Message
Our Team
Our Clients
Career
Menu Toggle
HR Benefits
Job Vacancies
Internship Program
Scholarship Program
Our Registrations
Downloads
Organogram
Services
Projects
Contact
LinkedIn
Main Menu
Home
Firm
Menu Toggle
About
MD’s Message
Our Team
Our Clients
Career
Menu Toggle
HR Benefits
Job Vacancies
Internship Program
Scholarship Program
Our Registrations
Downloads
Organogram
Services
Projects
Contact
Assignment Name:
Traffic Circulation Improvement study after introduction of BRT System in CBD Area Karachi
Country:
Pakistan
Location within Country:
Karachi.
Name of Client:
part of Red Line BRT ODBM Package under ADB Contract
Completion Date:
September/2018
Name of Associated Consultants, if any:
None
Narrative Description of Project:
Analysis of Existing Traffic Conditions
Analysis of Predicted traffic conditions after 5 years
Analysis of Traffic conditions after the introduction of the BRT System
Description of Actual Services Provided by Our Staff within the Assignment:
Detailed study of on field conditions i.e. road widths, No. of lanes, existing signal timings, Encroachments, on street parking etc.
Detailed Traffic Volume Counts on all Junctions of M.A. Jinnah Road, Prince Road and Nishtar Road.
Development of microsimulation model on PTV VISSIM of Existing Conditions i.e. Base Case.
Calibration of Base Case Model.
Microsimulation Analysis of Predicted traffic conditions without introduction of the BRT System.
Microsimulation Analysis of Predicted traffic conditions with introduction of the BRT System.
Propose Mitigation measures to improve the system.
Provide essential recommendations in order to run smooth BRT and mix traffic operations in the area.
Scroll to Top
Search for:
Search Button